Acquisition survived the preanode grounding — 2026-09-10

The rig recorded throughout today's repeated plasma losses. No ADC exception or recovery was logged, so this run supports continued acquisition but does not demonstrate the new retry path recovering an I²C fault.

Evidence

Read over SSH without changing the rig, 2026-09-10 around 20:00 JST:

  • Rig checkout: 4c3ca18, version 4.12.0.
  • cu_20260910_181445.csv: 20,257 rows, all 26 columns, from 18:14:45.715705 through 19:43:04.745302 JST.
  • controlunit.log records the deliberate acquisition Stop and ADC thread stop at 19:43:05, followed by a new run at 19:43:12. No intervening reader stop, ADC read/step failure, recovery, or Reader lost/back message.
  • controlunit.stderr.log has the launch marker at 18:14:28 and no subsequent output for this run. No traceback or errno was captured.
  • The message log contains 372 NUL bytes elsewhere; it was read as text (grep -a and Python decoding), so ordinary grep's binary-file shortcut did not conceal diagnostic lines from this review.
  • Sampling changed to 1 s at 18:17:00, then 0.1 s at 18:52:32. From 18:53 onward, 17,107 successive intervals have median 0.161784 s and maximum 0.498715 s (19:33:23.407578 → 19:33:23.906293). None exceeds 1 s. The configured 10 Hz is not achieved row cadence; the fast path waits its period before conversion and processing. Timing overhead is distinct from a reader death. The early slow-sampling period was excluded from this check.

Relation to the lab observations

The September 10 journal records preanode shorting at 19:12, repeated losses and recoveries through 19:27, and at 19:37 a measured 5 Ω from preanode to ground, versus 2 MΩ to anode and 17 MΩ to cathode immediately after the discharge. The owner confirms preanode grounding and plasma extinction. These are the operator's hardware measurements, not measurements from the ControlUnit: this CSV has no preanode voltage or resistance channel.

Today's cathode drive was manual, with PID off in the command log. It is therefore not a repeat under identical conditions of yesterday's PID-driven failures. It neither isolates the effect of the retry fix nor rules out a PID-path contribution. Yesterday's I²C/EMI explanation remains a hypothesis: without the original exception it was stronger than the evidence justified. The precise electrical coupling path and physical reason for the preanode short remain unmeasured.

What this establishes

The new diagnostics are installed, and recording survived the reported hardware failure episodes without a long gap. They captured no useful ADC error on this run because none was reported. A future logged ADC read failed, ADC answering again, or ADC step failed would distinguish a recovered acquisition fault from a clean run. Continue preserving both logs and the matching CSV; do not infer an errno from the absence of one.

Sources: rig files named above; PIHTI Log journal for September 9 and 10; controlunit/devices/adc.py retry and fast sampling paths. A companion note is indexed in the lab vault's Troubles hub. No pull or restart was performed.

Timing follow-up: survival does not establish correct sampling

The owner challenged the 0.499 s maximum against the requested 0.1 s period. That is a valid timing defect, not a clean timing result. Further read-only analysis of the same 17,107 intervals gives mean 0.175640 s (about 5.69 rows/s), 95th percentile 0.249573 s and 99th percentile 0.270603 s. There are 846 intervals above 0.25 s, 46 above 0.3 s and five above 0.4 s. Percentiles use the sorted interval at floor((N-1)*p).

Four of the five intervals above 0.4 s occur at 19:33:14–26; the other is 19:27:43.651709–19:27:44.112594. The 19:33 minute has 21 intervals above 0.3 s. Before cathode operation, 18:53–19:08 already averages 0.161044 s per row, with maximum 0.283088 s. From 19:33–19:38 the mean is 0.194339 s. The chronology does not isolate plasma interference from increasing application load or other timing causes.

One cause of the systematic rate shortfall is definite in source: collect_one_reading() sleeps the entire configured period, then reads the channels; row processing also occurs between timestamps. It does not subtract that work from the next wait. This explains why 0.1 s is not a 0.1 s row cadence, but does not identify the extra delay in the worst bursts.

The ADC conversion-ready loop raises only after 10,000 polls, not after a wall-time deadline. A slow successful read is not logged. Main-thread history concatenation, CSV writing and plot updates are other candidate costs; their contribution through scheduling/interpreter contention has not been measured. CSV timestamps are assigned in the worker before row construction, so these gaps are not merely delayed disk flush timestamps.

The present evidence distinguishes thread survival from timing quality. Next diagnostic work should measure monotonic elapsed time for waiting, channel reads, row processing and main-thread handling, and report overruns even without exceptions. Use deadline scheduling for the requested cadence, with an explicit policy for missed deadlines; do not invent missing samples or compress their recorded timestamps. No acquisition code was changed in this follow-up.